Calculate the arrow mark for a 90° conduit stub using a verified preset or your bender's take-up.

90-degree bend inputs

Configure the stub-up

Project information for worksheet

Marking preview

90° stub-up

Finished stub 14 inArrow mark 8.00 in

Calculated field mark

Stub height minus bender take-up

Finished stub14 in
Take-up6 in
Arrow mark8.00 in

90-degree stub guidance

Use the take-up printed for the actual bender

The calculation is simple; selecting the correct take-up is the critical part. Manufacturer, conduit type, trade size, and bender model must match.

What is bender take-up?

Take-up is the amount subtracted from the desired finished stub height to locate the bender arrow mark. Use the value printed on or specified for the exact bender.

How do I calculate a 90-degree stub mark?

Subtract the bender take-up from the desired finished stub height, measure that distance from the conduit end, and align the bender arrow to the mark.

Why does the calculator default to custom take-up?

Take-up varies by bender and conduit size. Custom input keeps the workflow manufacturer-neutral; verified Klein hand-bender values are optional presets.

See the verified source and limitations on the methodology page.